Stop Santos

Santos wants to build the Narrabri Lateral Pipeline from their gas processing facilities at Leewood to the unbuilt Hunter Gas Pipeline. This would carve a 30-metre-wide corridor for 50-60 kilometres through the Pilliga forest and some of the state’s best farmland. Continue reading “Stop Santos”